Appendix 7 Policy Number Comparison

This table has been prepared to provide a comparison between Policy numbers formerly used within the Revised Deposit Replacement Calderdale UDP (March 2004) and this published version of the Adopted Replacement Calderdale UDP (August 2006) in order to inform readers.

The changes have occurred as a result of additions, deletions and revisions to policies through the various stages of plan preparation and the final document has been edited to provide a clear through numbered sequence.

Table 7.1 Policy Number Comparison

Revised Deposit UDP (2004)

Draft Policy Number

POLICY TITLE

Replacement UDP (2006)

Policy Numbers As Adopted

PART ONE POLICIES

PART ONE PRINCIPLES POLICIES

GP1

ENCOURAGING SUSTAINABLE DEVELOPMENT

GP1

GP2

LOCATION OF DEVELOPMENT

GP2

GP3

DEVELOPMENT OUTSIDE URBAN AREAS

GP3

GP4

PROMOTION OF URBAN AND RURAL REGENERATION AND RENAISSANCE

GP4

PART ONE EMPLOYMENT POLICIES

GE1

MEETING THE ECONOMIC NEEDS OF THE DISTRICT

GE1

GE2

PROVISION OF EMPLOYMENT LAND

GE2

GE3

THE DEVELOPMENT OF EMPLOYMENT SITES FOR NON EMPLOYMENT USES

GE3

GE4

PRIORITIES FOR THE RECLAMATION AND RESTORATION OF DERELICT LAND AND BUILDINGS

GE4

PART ONE HOUSING POLICIES

GH1

MEETING CALDERDALE’S HOUSING NEEDS

GH1

GH2

PROVISION OF ADDITIONAL DWELLINGS

GH2

PART ONE RETAILING AND TOWN CENTRES POLICIES

GS1

RETAIL STRATEGY

GS1

GS2

THE LOCATION OF RETAIL AND KEY TOWN CENTRE AND LEISURE USES

GS2

GS3

SCALE OF RETAIL PROPOSALS

GS3

PART ONE OPEN SPACE POLICIES

GOS1

THE PROTECTION AND ENHANCEMENT OF OPEN SPACE, SPORTS AND RECREATION FACILITIES

GOS1

GOS1A

AUDIT AND ASSESSMENT OF OPEN SPACE, SPORT AND RECREATION FACILITIES AND NEEDS

GOS2

PART ONE BUILT AND HISTORIC ENVIRONMENT POLICIES

GBE1

THE CONTRIBUTION OF DESIGN TO THE QUALITY OF THE BUILT ENVIRONMENT

GBE1

GBE2

PIECEMEAL DEVELOPMENT

GBE2

PART ONE TRANSPORT POLICIES

GT1

PROVISION OF A SUSTAINABLE, SAFE AND EFFICIENT TRANSPORT SYSTEM

GT1

GT2

PRIORITIES FOR TRANSPORT INVESTMENT

GT2

GT3

STRATEGIC ROAD NETWORK

GT3

GT4

HIERARCHY OF CONSIDERATION

GT4

GT5

TRANSPORT ASSESSMENTS

GT5

GT6

HIGHWAY AND PEDESTRIAN IMPROVEMENTS ASSOCIATED WITH DEVELOPMENT

GT6

GT7

HIGHWAYS PROPOSALS

GT7

PART ONE INFRASTRUCTURE, EDUCATION AND COMMUNITY FACILITIES POLICIES

GCF1

INFRASTRUCTURE AND OTHER NEEDS ARISING FROM DEVELOPMENT

GCF1

GCF1A

DEVELOPMENT ENABLING STATUTORY UNDERTAKERS

GCF2

GCF2

STRATEGIC FRAMEWORK FOR COMMUNITY FACILITIES

GCF3

GCF3

MATCHING SCHOOL FACILITIES TO EDUCATIONAL NEEDS

GCF4

GCF4

CRITERIA FOR PREPARING EDUCATION INFRASTRUCTURE PROGRAMMES

GCF5

PART ONE NATURAL ENVIRONMENT POLICIES

GNE1

CONTAINMENT OF THE URBAN AREA

GNE1

GNE2

PROTECTION OF THE ENVIRONMENT

GNE2

PART ONE ENVIRONMENTAL PROTECTION POLICIES

GEP1

PROTECTION OF ENVIRONMENTAL QUALITY

GEP1

GEP2

MANAGEMENT AND CONSERVATION OF NATURAL RESOURCES

GEP2

PART ONE MINERALS POLICIES

GM1

MINERALS STRATEGY

GM1

GM2

AGGREGATE MINERALS

GM2

GM4

RECYCLING

GM3

PART ONE WASTE MANAGEMENT POLICIES

GWM1

WASTE STRATEGY

GWM1

GWM2

NEW WASTE FACILITIES

GWM2

PART TWO POLICIES

PART TWO EMPLOYMENT POLICIES

E1

Primary Employment Areas

E1

E2

Employment Development outside the Primary Employment Areas

E2

E3

Sites Allocated for Employment Use

E3

E4

Sites Allocated for Mixed-Use

E4

E5

Safeguarding Employment Land and Buildings

E5

E7A

A2 (Financial and Professional Services) Office Development.

E6

E8A

Sequential Approach for Major B1 Office Development

E7

E8B

Criteria for Assessing Major Office B1 Development

E8

E9

Warehousing

E9

E10

Tourism Development

E10

E11

Hotels, Motels and Other Visitor Accommodation

E11

E12

Caravan and Camping Sites

E12

E13A

Encouraging Rural Diversification

E13

E13B

The Conversion and Adaptation of Rural Buildings for Commercial or Business Uses

E14

E14

The Safeguarding of Better Quality Agricultural Land

E15

E15

The Development of Agricultural Land

DELETED

E16

Agricultural and Equestrian Development

E16

E17

Dog and Cat Boarding/Breeding Facilities

E17

E18

The Reclamation and Restoration of Derelict Land and Buildings

E18

E18A

Regeneration Priority Areas in the Upper Calder Valley

E19

N/A

Regeneration Action Area: Sowerby Bridge Copley Valley

E20

E19

Sowerby Bridge Canal Wharf

E21

E20

The Piece Hall

E22

PART TWO HOUSING POLICIES

H1

Separation of Housing and Industry

H1

H2

Primary Housing Areas

H2

H3

Housing Renewal

H3

H4

Improvement and Re-use of Existing Dwellings

H4

H5

Phase 1 Housing Allocations

H5

H6

Monitoring of Housing Developments

H6

H7

Phase 2 Housing Allocations

H7

H7A

Phase 3 Housing Allocations

H8

H7B

Lower Edge Quarry, Rastrick

DELETED

H8

Non-Allocated Sites

H9

H9

Density of Housing Developments

H10

H10

Mix of Housing Types

H11

H11

Living Over Shops and Business Premises

H12

H12

Affordable Housing

H13

H13

Provision of Visitability Standard Housing

H14

H14

Lifetime Homes

H15

H15

Houses In Multiple Occupation

H16

H16

Gypsy Sites

H17

PART TWO RETAILING AND TOWN CENTRES POLICIES

S1

Sequential Approach for Retail and other Key Town Centre or Leisure Uses

S1

S2

Criteria for Assessing Retail Developments

S2

S3

Local Shopping Outside Centres

S3

S4

Retail Developments in the Green Belt

S4

S5

Farm Shops and Nursery Gardens

S5

S6

Primary Shopping Frontages

S6

S7

Secondary Shopping Frontages

S7

S8

Tertiary Mixed-Use Frontage

S8

S9

Non-Retail Uses in Smaller and Local Centres

S9

S9A

Halifax Residential Priority Regeneration Area

S10

S10

Halifax Office Amenity Area

S11

S11

Halifax Residential Amenity Area

S12

S12

Halifax, Mixed-Use Day and Night Business Area

S13

S13

Temporary Retailing and Car Boot Sales

S14

S14

Hot Food Takeaways

S15

S15

Shop Fronts in New Retail Developments

S16

S16

New and Replacement Shop Fronts

S17

PART TWO OPEN SPACE POLICIES

OS1

Protected Open Spaces

OS1

OS2

The Provision of Open Space in Areas of Deficiency

OS2

OS3

The Safeguarding of Sports Grounds and Playing Fields

OS3

OS4

The Provision of Sports and Recreation Facilities

OS4

OS5

The Provision of Recreational Open Space in Residential Development

OS5

OS6

The Safeguarding of Allotments

OS6

OS7

The Provision of Allotment Sites

OS7

OS8

Development Within or at the Edge of Common Land

OS8

OS9

The Recreational Use of Waterways and Open Water

OS9

OS10

Former Halifax Branch Canal

OS10

PART TWO BUILT AND ENVIRONMENT AND HISTORIC ENVIRONMENT POLICIES

BE1

General Design Criteria

BE1

BE2

Privacy, Daylighting and Amenity Space

BE2

BE4

Landscaping

BE3

BE5

Safety and Security Considerations

BE4

BE6

The Design and Layout of Highways and Accesses

BE5

BE7

The Provision of Safe Pedestrian Environments

BE6

BE9

CCTV and Area Lighting Schemes

BE7

BE10

Access for All

BE8

BE11

The Provision of Public Conveniences and Baby Facilities

BE9

BE12

Art in Public Places

BE10

BE13

Telecommunications

BE11

BE14

Advertisements

BE12

BE15

Advertisement Hoardings

BE13

BE16

Alteration and Extension of Listed Buildings

BE14

BE17

Setting of a Listed Building

BE15

BE18

Change of Use of a Listed Building

BE16

BE19

Demolition of a Listed Building

BE17

BE20

Development within Conservation Areas

BE18

BE21

Demolition within a Conservation Area

BE19

BE22

Protection of Registered Historic Parks and Gardens

BE20

BE22A

Protection of Locally Designated Historic Parks and Gardens

BE21

BE23

Archaeological Sites of National Significance

BE22

BE24

Archaeological Sites of Regional Importance

BE23

BE25

Protection of Sites of Archaeological Value

BE24

BE26

Archaeological Assessment

BE25

BE27

Archaeological Recording

BE26

PART TWO TRANSPORT POLICIES

T1

Travel Plans

T1

T2

Bus Priority Measures

T2

T3

Public Transport Provision at New Development

T3

T4

Bus Station and Passenger Facilities at Brighouse, Elland and other Locations

T4

T4A

Transport Interchanges and Park & Ride

T5

T4B

Rural Service Centres

T6

T5

Private Hire Operating Centres

T7

T6

Taxi and Private Hire Radio Offices

T8

T7

Socially Inclusive Transport Network

T9

T8

Safeguarding Public Rights of Way

T10

T9

Protection of the Sites of Former Railway Lines

T11

T10

Applications Affecting Public Rights of Way

T12

T11

Cycleways

T13

T12

Traffic Management Schemes

T14

T13

On-Street Parking Controls

T15

T14

New and Extended Pedestrian Priority Schemes

T16

T15

Abandoned Highway Proposals

T17

T16

Maximum Parking Allowances

T18

T17A

Bicycle Parking Guidance

T19

T17B

Motorcycle/Moped/Scooter Parking Guidance

T20

T18

Car Free and Low Car Ownership Housing

T21

T19

Development of Garage Courts

T22

T20

Lorry Routeing, Parking and Signing

T23

T21

Use of Waterways and Railways for Freight Movement

T24

T22

Goods Vehicle Operating Centres

T25

T23

Helicopter Landing Facilities

T26

T24

Safeguarding Aerodromes and Air Traffic Technical Sites

T27

PART TWO INFRASTRUCTURE, EDUCATION AND COMMUNITY FACILITIES POLICIES

CF1

Co-ordination of Schools and Housing

CF1

CF2

New Schools and Other School Related Proposals

CF2

CF4

Use of Schools for Community Purposes

CF3

CF5

Release of Surplus Educational Land and Buildings

CF4

CF6

Development Involving the Loss of Village Shops, Post Offices, Public Houses or Hotels

CF5

CF7

Cemeteries

CF6

CF8

Collective Needs Accommodation and Residential/Nursing Homes

CF7

CF9

Day Care Facilities for Children

CF8

CF10

Medical, Dental or Health Facilities

CF9

CF11

Major Leisure/Entertainment Uses

CF10

CF12

Uses Near Places of Worship

DELETED

PART TWO NATURAL ENVIRONMENT POLICIES

NE1

Development within the Green Belt

NE1

NE2

Extensions and Alterations to Dwellings in the Green Belt

NE2

NE2

Extension and Alteration to Other Buildings in the Green Belt

NE3

NE3

Conversion or Change of Use of Buildings in the Green Belt

NE4

NE4

Replacement Dwellings in the Green Belt

NE5

NE5

New Gardens in the Green Belt

NE6

NE6

Development Within The Named Village Envelopes in the Green Belt

NE7

NE6A

Redevelopment Proposals in the Green Belt

DELETED

NE7

Appropriate Development for the Area Around Todmorden

NE8

NE8

Development Within Settlements in the Area Around Todmorden

NE9

NE9

Garden Extensions Within the Area Around Todmorden

NE10

NE10

Protected Land

NE11

NE11

Development Within the Special Landscape Area

NE12

NE12

Protection of Sites of International Importance

DELETED

NE13

Protection of Sites of National Importance

NE13

NE14

Protection of Locally Important Sites

NE14

NE15

Development in Wildlife Corridors

NE15

NE16

Protection of Protected Species

NE16

NE17

Biodiversity Enhancement

NE17

NE18

Ecological Protection of Water Areas

NE18

NE19

Protection of Uncultivated Land or Semi-Natural Areas

DELETED

NE20

Protection and Planting of Woodlands and Trees

DELETED

NE21

Protection of Ancient Woodland

NE19

NE22

Tree Preservation Orders

NE20

NE23

Trees and Development Sites

NE21

NE24

Protection of Hedgerows

NE22

NE25

Protection of Stone Walls

NE23

PART TWO ENVIRONMENTAL PROTECTION POLICIES

EP1

Protection of Air Quality

EP1

EP2

Development within an Air Quality Management Area

EP2

EP3

Noise Generating Development

EP3

EP4

Protection from Existing Noise

EP4

EP5

Control of External Lighting

EP5

EP6A

Dangerous Substance Establishments

EP6

EP6B

New or Extended Dangerous Substance Establishments

EP7

EP6C

Other Incompatible Uses

EP8

EP7

Development of Contaminated Sites

EP9

EP8

Development of Sites with Potential Contamination

EP10

EP9

Development on Potentially Unstable Land

EP11

EP10

Protection of Water Resources

EP12

EP11

Development Involving Non-Mains Drainage

EP13

EP12

Protection of Groundwater

EP14

EP13

Development Alongside Waterways

EP15

EP14

Protection of Washland and Functional Floodplain

EP16

EP15

Protection of Indicative Floodplain

EP17

EP16

Development Behind Flood Defences

EP18

EP17

Development Outside Floodplains

EP19

EP18

Protection from Flood Risk

EP20

EP19

Developments Involving Watercourse Improvements

EP21

EP20

Sustainable Drainage Systems

EP22

EP21

Culverting of Watercourses

EP23

EP22

Control of Overhead Electricity Lines

EP24

EP22A

Energy Efficient Development

EP25

EP23

Encouraging the Use of Combined Heat and Power Systems

EP26

EP23A

Renewable Energy in Developments

EP27

EP24

Development of Renewable Energy Sources

EP28

EP25

Developments Close to Renewable Energy Installations

EP29

EP26

Wind Power Developments

EP30

EP27

Development Incorporating Solar Heating and Power Systems

EP31

EP28

Protection of Solar Heating, Photovoltaic Panel and Passive Solar Design Developments

EP32

EP29

Renewable Power Generation

EP33

PART TWO MINERALS POLICIES

M1

Criteria for Assessing All Mineral Working Proposals

M1

M2

Details Required with any Minerals Planning Application

M2

M3

Extensions to Existing Workings

M3

M4

Safeguarding Mineral Resources

M4

M5

Coal Extraction and Colliery Spoil Disposal

M5

M6

Oil and Gas

M6

M7

Peat

M7

M8

Reclamation of Mineral Working Sites by Landfill

DELETED

M9

Review of Mineral Working Sites

M8

M10

Re-working of Mineral Deposits

M9

M11

Recycling

M10

PART TWO WASTE MANAGEMENT POLICIES

WM1

Criteria for Assessing Waste Management Facilities

WM1

WM2

Information Required with Applications for Waste Management Facilities

WM2

WM4

Landfilling of Wastes

WM3

WM5

Recycling at Existing Household Waste Disposal Sites

WM4

WM6

Provision of Household Waste Disposal Sites

WM5

WM7

Transfer and Treatment of Waste

WM6

WM8

Digestion and Mixed Waste Composting

WM7

WM9

Green Waste Composting

WM8

WM10

Incineration

WM9

WM11

Reworking of Former Landfill Sites

WM10

Back to Top