5 How are developer contributions for off-site open space calculated?
5.1 The level of developer contribution for open space, sport and recreation facilities will always depend on whether it includes the cost of land acquisition. Draft costs based on developer contributions per residential unit for each type of open space are shown below in Table 5.1.
5.2 The following figures give the commuted sum rates for enhancing existing open spaces and providing new open spaces. They are based on 2007 rates (updated annually) for laying out a new open space, as appropriate by category and are calculated by multiplying the ‘provision rate per person’ (based on the accessibility/quantity standards) by the ‘cost of laying out per hectare’. The new provision rates include a rule of thumb land value of £10,000 per acre (£24,711 per hectare) as an additional cost for laying out the facility, but are otherwise identical to the enhancement calculation.
5.3 These tables will provide guidance for the calculation of commuted payments by developers for the provision or enhancement of open space. They provide a starting point for negotiations between the Council and developers.
| Dwelling Type | Elderly persons | 1 Bedroom | Family homes | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2 bedroom | 3 bedroom | 4+ bedroom | 5+ bedroom | ||||||||||
| Provision type - Enhanced (E) or New (N) | E | N | E | N | E | N | E | N | E | N | E | N | |
| Open Space Type | |||||||||||||
| Parks & Gardens | Formal open space | 97 | 104 | 97 | 104 | 194 | 209 | 292 | 313 | 389 | 417 | 486 | 522 |
| Allotments & Community Gardens | 14 | 21 | 14 | 21 | 29 | 43 | 43 | 64 | 57 | 86 | 72 | 107 | |
| Cemeteries | 45 | 52 | 45 | 52 | 91 | 105 | 136 | 157 | 182 | 210 | 227 | 262 | |
| Civic Spaces | 64 | 64 | 128 | 192 | 256 | 320 | |||||||
| Amenity greenspace | Informal open space | 8 | 14 | 8 | 14 | 16 | 29 | 24 | 43 | 32 | 58 | 40 | 72 |
| Natural/ semi-natural and green corridors | 16 | 23 | 16 | 23 | 32 | 45 | 49 | 68 | 65 | 90 | 81 | 113 | |
| Outdoor sports facilities | Formal sports facilities | 151 | 911 | 151 | 911 | 302 | 1822 | 453 | 2732 | 604 | 3643 | 755 | 4554 |
| Indoor sports facilities | 35 | 35 | 71 | 106 | 141 | 176 | |||||||
| Provision for children and young people | 180 | 215 | 269 | 323 | 359 | 430 | 449 | 538 | |||||
| Maximum Total Contribution | £431 | £431 | £1043 | £1564 | £2085 | £2606 | |||||||
Note 1. The cost of providing new civic spaces has not been calculated as it expected normally that an existing area will be enhanced. However this does not preclude the provision of new civic space as an alternative to other formal open space.
Note 2. The cost of providing new indoor sports facilities has not been calculated as it is expected that normally these facilities will not be provided on site.
Note 3: The contributions for typologies will sometimes be combined within their categories for effectiveness of provision of open space, sport and recreation facilities.
Note 4 : New employment uses over 50 equivalent full-time employees would generate a need for civic spaces, parks and gardens, natural and semi-natural outdoor space and outdoor and indoor sports facilities. Such details would be negotiated at the application stage.
Maintenance
5.4 For new on-site provision long term maintenance will be arranged through one of two options:
- Developers will establish a mechanism for maintenance e.g. through a management company for which residents would pay annual service charge.
- When a developer hands over title and responsibility for on-site provision to a local authority or a third party such as a parish council or trust, the long term maintenance would be the responsibility of the body in whom the facility is vested.
5.5 The calculation which the Council uses to determine commuted sums for maintaining on-site open space in perpetuity is based on a multiplier of 41 years. It is a complex formula and is not shown in this SPD. Using the formula, it is possible to calculate the level of commuted sum that a developer will be required to pay for each type open space. These levels are reproduced below. The commuted sums are shown per hectare (ha) for everything except Provision for Children and Young People, which are shown as a cost per play area i.e. Locally Equipped Area for Play (LEAP)( See Appendix 6 for definitions). The figures show the annual maintenance cost and also the total cost per hectare/per play area after the multiplier has been applied. All of the costs are based on the layout of the open space and use current contract rates or 2006/07 budget papers as the basis for calculation.
| Typology |
Maintenance cost/ha |
|
|---|---|---|
| Cost p/a | Total Cost | |
| Parks and Gardens | £11,726 | £480,757 |
| Allotments | £260 | £10,658 |
| Cemeteries | £2,622 | £107,486 |
| Civic Spaces | £0 | £0 |
| Amenity Green Space | £235 | £9,651 |
| Natural/semi-natural Green Space | £227 | £9,322 |
| Outdoor Sports | £3,416 | £130,287 |
| Indoor facilities | * | * |
| Children and Young People | £1,884 | £77,246 |
*No maintenance cost have been calculated for indoor facilities as it is expected that these facilities will not normally be provided on site. Such instances will be negotiated at the time.